Does enabling demolition work?

Does enabling demolition work? Enabling works is a generic description for site preparation works that might take place prior to work under the main construction contract. This could include: Demolition.

Is scaffolding enabling works?

The term Enabling Works covers activities including: Site clearance including removing underground obstructions. Asbestos surveying and removal. Temporary works including haul roads, scaffolding, hoarding and diversion of services.

What is a PCSA contract?

A pre-construction services agreement (PCSA) is used to appoint a design and build contractor to carry out services before entering into a formal building contract. … A PCSA is a formal agreement to provide specified services (and sometimes to carry out specific works) and is not a letter of intent.

What are preliminary works in construction?

Preliminary Works means operations consisting of site clearance, environmental surveys, investigations for the purpose of assessing ground conditions, erection of any temporary means of enclosure, the temporary display of site notices or installation of a site compound or any other temporary building or structure.

What are temporary works?

Temporary works (TW) are the parts of a construction project that are needed to enable the permanent works to be built. Usually the TW are removed after use – eg access scaffolds, props, shoring, excavation support, falsework and formwork, etc.


What is the best description of permanent works?

Permanent works are the parts of a construction project that will be used and remain in position for a long time – eg 60 years. This includes buildings and structures such as bridges, roads, retaining walls, etc. The construction of most types of permanent works will require the use of some form of temporary works.

Why are temporary works important?

Temporary works are vital in construction as they provide the correct structural support when the rest of the building is compromised in one way or another. Essentially they are the parts of a construction project required to enable the permanent structures to be built.

Are there any legal requirements to manage temporary works?

Regulation 13 (2) CDM 2007 can be used to require that temporary works are planned, managed and monitored in a way which ensures, so far as is reasonably practicable, they are carried out without risks to health and safety.

What is a design and build contract?

The JCT Design and Build Contract is designed for construction projects where the contractor carries out both the design and the construction work. Design and build projects can vary in scale, but the Design and Build Contract is generally suitable where detailed provisions are needed.

What is a two stage tender?

Two stage tendering is typically used for design and build projects and involves engaging a contractor at a much earlier stage of a project. … The successful contractor is then often engaged under a pre-construction services agreement (PCSA).

What is included in pre-construction services?

Pre-construction services go well beyond just estimating what a project will cost. They include everything from an initial client meeting to plans, schedules, studies, value engineering, permitting, land acquisition, and more.

What are contingencies in construction?

The term `contingency’ represents any incidental or miscellaneous character that cannot be classified under any distinct item sub-head, yet pertain to the work as a whole. contingencies in civil engineering is important while preparing estimate of any construction project.

How are preliminaries priced?

Preliminaries are all about cost overhead that has to be borne by the contractor to start the work and during the construction period. … This because all preliminaries items listed in the tender deemed to be priced by the contractor accordance with the Principle of the Standard Method of Measurement of Building Works.

What is prime cost sum?

A prime cost sum (PC or PC sum) is an allowance, usually calculated by the cost consultant, for the supply of work or materials to be provided by a contractor or supplier that will be nominated by the client (that is, a supplier that is selected by the client to carry out an element of the works and imposed on the main …

Does hoarding temporary work?

Site hoarding is a temporary structure erected around the perimeter of construction sites to prevent any unauthorised person gaining access1. In this way, site hoardings ensure the health and safety of the general public and enable a site to fulfil its obligations.

What is the most important element of temporary works management?

Major elements of temporary works design would be:

  • Design Brief / Design Statement.
  • Design Risk Assessment.
  • Temporary Works Categories.
  • An effective system of checking.
  • Design Check Certificate.
  • Design Change Control.
  • Design Review.

What is the biggest cause of chronic health issues in the construction industry?

Manual handling is the most commonly reported cause of over seven day injuries in the industry. Construction also has one of highest rates of ill health caused by noise and vibration.

What is falsework and formwork?

Falsework is ‘… scaffolding or other temporary structures used to support construction components until the construction is sufficiently advanced to allow the structure to support itself’. … Type 3 – Heavier steel falsework, such as; RMD Kwikform System Shoring or A-Plant Acrow Props.

What shoring means?

Shoring, form of prop or support, usually temporary, that is used during the repair or original construction of buildings and in excavations. Temporary support may be required, for example, to relieve the load on a masonry wall while it is repaired or reinforced.

What problems temporary works create?

The lack of stability and permanency of temporary works means that there is usually more of a danger of collapse, causing either fall or crush injuries (or death) to anyone unfortunate enough to be caught up in the incident.

Are MEWPs temporary works?

MEWPs are designed to provide a safe work platform for temporary work at height. In relation to the fall protection hierarchy, they are considered to be work equipment that can prevent a fall. … Planning is crucial to their safe operation and the stages below are designed to help you with your planning.

What are the 4 types of contracts?

What are the Different Types of Contract?

  • Contract Types Overview.
  • Express and Implied Contracts.
  • Unilateral and Bilateral Contracts.
  • Unconscionable Contracts.
  • Adhesion Contracts.
  • Aleatory Contracts.
  • Option Contracts.
  • Fixed Price Contracts.

What is the difference between design and build and traditional procurement?

Traditional procurement is highly contractural with limited flexibility that can add time to a project when the owner acts as the arbiter for any issues that arise throughout the design and build phases. Changing timelines equal higher costs, whereas D&B is agile and quick to adapt to client-side variations.

What is the design-build process?

Design-build is a method of project delivery in which one entity – the design-build team – works under a single contract with the project owner to provide design and construction services. One entity, one contract, one unified flow of work from initial concept through completion.