Sign Up

Sign In

Forgot Password

Lost your password? Please enter your email address. You will receive a link and will create a new password via email.

You must login to ask question.

Sorry, you do not have a permission to add a post.

Please briefly explain why you feel this question should be reported.

Please briefly explain why you feel this answer should be reported.

What is ship capacity plan?

What is ship capacity plan? A plan of the spaces available for cargo, fuel, fresh water, water ballast, etc, and containing cubic or weight capacity lists for such spaces and a scale showing deadweight capacities at varying draughts and displacements.

What is it called when a ship comes into port?

dock. verb. if a ship docks, it arrives at a dock.

How do you calculate deadweight?

To calculate the Deadweight tonnage figure, take the weight of a vessel that is not loaded with cargo and subtract that figure from the weight of the vessel loaded to the point where it is immersed to the maximum safe depth.

What is a docking plan?

A docking plan is a document that is prepared for every ship during its preliminary design phase. All the information required to bring a ship to a dry dock are included in its docking plan.

What do you mean by capacity planning?

Capacity planning is determining the ability of a production line, service department or function to meet a specified demand over a period of time. Inherent in this are actions required to adjust the capacity of the system to meet demand.


What is a Portcall?

1 any port where a ship stops, excluding its home port. 2 any place visited on a traveller’s itinerary.

What is the captain’s room called on a ship?

In sailing ships, the officers and paying passengers would have an individual or shared cabin. The captain or commanding officer would occupy the « great cabin » that normally spanned the width of the stern and had large windows.

What does MV stand for on a ship?

motor ship (MS) or motor vessel (MV): A ship propelled by internal-combustion engines.

What is deadweight?

1 : the unrelieved weight of an inert mass. 2 : dead load. 3 : a ship’s load including the total weight of cargo, fuel, stores, crew, and passengers.

How does deadweight work?

In a deadweight tester, the force is supplied by a mass in a gravitational field on top of a piston with a specific cross sectional area. … The pressure in the fluid is equal to the force exerted by the mass over cross sectional area of the piston.

What is deadweight loss example?

When goods are oversupplied, there is an economic loss. For example, a baker may make 100 loaves of bread but only sells 80. … This is a deadweight loss because the customer is willing and able to make an economic exchange, but is prevented from doing so because there is no supply.

What are the main docking and undocking operations?

Docking & Undocking

  • Cast off lines and pull in fenders as the wind blows you away.
  • When clear and safely away from the dock and other boats, shift to forward and depart at idle speed.
  • Be careful to make sure you have been pushed safely away and that the stern will not hit the dock as you motor forward and turn.

How long does dry docking take?

The water is drained from the dry-dock (generally overnight) over the course of about eight to ten hours, depending on the size of the vessel.

Why is dry docking needed?

The main purpose of a Dry Dock is to expose the underwater parts for inspection, repair and maintenance. The ship to be repaired is hence manoeuvred into the lock and the gates are sealed post which all the sea water accumulated in the vessel is drained for better inspection and repairs.

What is capacity planning with example?

On an assembly line in a car factory, for example, a painting robot might be able to paint 10,000 cars in a day. Considering this type of capacity is also important for workforce capacity planning; the workers on the assembly line are limited by the number of cars or parts a machine can process during a shift.

What are the types of capacity planning?

Types of Capacity Planning Strategies

  • LEAD STRATEGY. The Lead Strategy involves an upfront investment in more capacity that is needed and is one of the most aggressive approaches used. …
  • LAG STRATEGY. …
  • MATCH STRATEGY. …
  • DYNAMIC STRATEGY.

What are the steps in capacity planning?

How to develop an effective capacity planning process

  1. Select an appropriate capacity planning process owner.
  2. Identify the key resources to be measured.
  3. Measure the utilizations or performance of the resources.
  4. Compare utilizations to maximum capacities.
  5. Collect workload forecasts from developers and users.

Why is Singapore called port of call?

Singapore is known as the port of call because it is on the main sea route where ships use to anchor for refuelling, watering, and taking food items. Singapore borders the Straits of Malacca, Riau Islands and the South China Sea.

What is port operation?

Activities associated with ports include operation of vessels, cargo handling equipment, locomotives, trucks, vehicles, and storage and warehousing facilities related to the transportation of cargo or passengers as well as the development and maintenance of supporting infrastructure (also see Inland Port Inland Port …

What is first port of call?

noun. 1. (idiomatic) The first place to go to start a process. When you move to a new country, your first port of call is often the local police. To find the meaning of a word, your first port of call should be a decent dictionary.

Where do you sleep on a ship?

Sleeping quarters at the aft or rear section of the boat (sometimes called a mid-cabin when located beneath the helm).

What’s the best deck on a cruise ship?

The lower and more central you are in a ship, the less roll and sway you will feel. Even if you choose a balconied stateroom, choose the lowest level and the most midship one you can find. The higher decks and cabins at the very front (forward) or back (aft) of the ship will rock and roll the most.

Where do sailors sleep on a ship?

At night, seamen sleep in hammocks slung between beams or at least, half of them do. The crew is divided into two “watches” (teams). One watch sails the ship from 8pm to midnight, then sleeps for four hours while the other watch works.

Why are boats called SS?

S.S. stands for Sailing Ship, which even though she had 2 diesel engines, she still qualifies as a sailing ship because she is equipped with sails. U.S.S. is what we are accustomed to, HMS as well. According to experts it short for « Steam Ship. »

What means MV?

MV means « Music Video. »

What is the difference between MV and MT?

MV = Motor/Merchant Vessel. … SS = Steam Ship. MT = Motor Tanker or Motor Tug Boat.

References

 

Leave a comment